Past Project Documents

» Existing and Future Conditions Technical Memorandum
» Evaluation Methodology Technical Memorandum
» Purpose & Need Technical Memorandum
» Wetland Evaluation Biological Assessment Report
» Cultural Resources Assessment Survey
» Type 2 Categorical Exclusion Determination Form
» Preliminary Engineering Report (December 2013 Draft)
» Stakeholder Meeting Presentation

Past Newsletters

Past Public Hearings

A public hearing was held on October 8, 2013 and October 10, 2013. Project documents were available for review between September 17, 2013 and October 21, 2013.

Public Hearing Materials - PD&E Study

click the images below for larger version



Welcome

Federal and State
Requirements

Existing
Typical Sections

Recommended
Typical Sections

Conceptual Plan of
Recommended
Alternative

Alternatives
Evaluation Matrix

Study Schedule

Potential Sequencing
of Construction

Bridge Profiles

Non-Discrimination
Laws & Regulations

Newsletter
 

Public Hearing Materials - Regional Transit Corridor Evaluation

click the images below for larger version



Transit Alternatives
Evaluation Data

Transit Evaluation
Summary

Future Bridge
Expansion Express
Lanes

Future Regional
Transit Options
 
 
Facebook Twitter
Join our Mailing List
 Email:
 
Project Overview
What Is A PD&E Study?
What Is A Transit Corridor Evaluation?
Project Details
Public Involvement
Project Fact Sheet
Newsletters
Stakeholder Meetings
Public Hearing
Project Schedule
Project Documents
FAQ
Contact Information
Send Us Your Comments
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S. C. §327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT.
Return to www.fdottampabay.com Tampa Bay Next Forward Pinellas FDOT TBARTA Aerial View of Howard Frankland Bridge